I have finally gotten the 2nd set of additional chine strips shaped down to my liking. Im predicting that all of the faired surfaces will still have to be adjusted a little when the planking is being fitted. Thats fine. For the most part, however, I believe the fairing phase is basically done.
The first part of the planking stage will be to cover the transom with a layer of the Meranti Hydrotek. My goal is to bright-finish the transom, and I want it to match the deck. Before I can add another layer onto the transom, however, I have to sand down some remnants of dried epoxy.
Here are some iPhone photos of the progress:
The first part of the planking stage will be to cover the transom with a layer of the Meranti Hydrotek. My goal is to bright-finish the transom, and I want it to match the deck. Before I can add another layer onto the transom, however, I have to sand down some remnants of dried epoxy.
Here are some iPhone photos of the progress:
Starboard chine at frame #1. |
Starboard chine at frame #1. |
Port chine at frame #1. |
I have to sand off these bits of dried epoxy before I can add another layer onto the transom. |