All the bottom planking is finally fitted.
Two steps forward and one step back. Technically, that is still progress. That’s also the current situation with the Utility as I try to finish up the bottom planking.

In a nutshell, the panels are all fitted, but there is a little more fairing work to be done. Back in March, I mentioned in a post that there appeared to be a low spot on the port chine. With the planking on, I can see that this problem is compounded by a second one: there is also a high point on frame #1.


These two photos show the "hook," or low spot in the planking caused by a high point on frame #1 and a low spot in the chine.



So, what needs to be done now?

I’ll have to remove the panels, and sand down that high point on the frame. I’ll also have to add some more wood to the chine to build up the low area. Then the panels can go back on to re-check the fitting.

Aside from that issue, there has been other progress. I cut away part of the sole support on the transom to make room for a drain tube. I have not decided yet for certain if I will add a drain tube or not. However, if I do, part of the sole support would need to be removed. That is much more easily done before the bottom planking is attached permanently. I cut away a section 1-3/4" wide, next to the port transom knee. That should allow enough room to install a 1" drain tube. A coping saw and a couple of chisels handled the job nicely.



1-3/4" of the sole support on the transom cut away to make room for a drain tube.


 